JBN | JEWELS BY NIMIT
PREPARED FOR: KARMA JEWELRY
STRATEGIC MANUFACTURER PARTNERSHIP

Strategic Manufacturing Optimization

Scaling production, recovering margins, and upskilling local operations in Bali, Indonesia.

PRESENTER Nimit | Jewels by Nimit
ECOSYSTEM Jaipur, India
THE BOTTLENECK

The Hidden Cost of Standard Sourcing

01

Direct Sourcing Inefficiencies

Importing finished jewelry carries heavy direct premiums, compounding operational risks, and leading to critical production delays.

02

Lost Operational Flexibility

Reliance on overseas manufacturing limits your immediate production control, increases lead times, and reduces your market agility.

Standard finished jewelry importing challenges
Standard overseas importing leaves margins unprotected.
MARGIN LOSS

The Sourcing Penalty

8,211,000
IDR / KG
Sourcing penalty paid on every single kilogram imported.

Equivalent to ~43,222 INR per KG.

Why This Bleed Occurs

💰

Silver Price Premium

Paying premium retail rates on the Indian silver market instead of direct wholesale pricing.

🛠️

Inflated Making Charges

Adding this much amount in your invoice.

✈️

Logistics & Customs Overhead

Continuous shipping, customs clearance, port clearance, and high insurance premiums on finished cargo.

WHO WE ARE

Jewels by Nimit: Export-Quality Engineering

An export-grade manufacturing ecosystem based in Jaipur, India. We combine advanced technical knowledge with operational execution to eliminate production bottlenecks.

250 KG Monthly Output Capacity
25 Skilled Artisans & Technicians
Global Serving USA, Germany, Italy & Canada
  • 925 Hallmarked Silver
  • Advanced CAD Designing
  • CPX Prototyping
  • Advanced Casting Process
  • High-Yield Casting
  • Micro-Pave Stone Setting
  • Prong Setting
  • Quality Checks
  • Polishing & Finishing
Jaipur factory artisan crafting
Jaipur Factory Floor
INTEGRATION STRATEGY

How We Scale Karma Jewelry

Two flexible partnership models designed to optimize your operations and recover margin leakage.

TIER 01

Team Member

We can deploy 2 core team members of our production team at your premises to run Bali shop floor.

  • Direct transplant of export-grade workflows
  • In-house upskilling of your entire local team
  • Immediate operational support and quality control
OPERATIONAL SUPPORT
TIER 02

Team Member + Machinery

We deploy 2 core team members of our production team at your premises alongside exporting our proprietary casting, polishing, and recovery machinery.

  • Upgrades Bali floor to industrial standards
  • Full hardware calibration & digital SOP support
  • 12-month supply of standard wear spares included
MAXIMUM VALUE TRANSFER
TECHNICAL SUPERIORITY

How Our Tech Pays for Itself

Traditional workshops lose significant material. Our engineering protocols stop the leak at every stage.

01

Vacuum Buff Polishing

Captures airborne silver dust at source. Recovers lost metal directly and converts waste back into raw material savings.

Ultrasonic Cleaning
02

Ultrasonic Cleaning

Industrial-grade cleaning cells paired with specialized cleaning powders to strip all residue before electroplating.

03

Advanced Grinding & Filing

Ergonomic tables and specialized abrasives to ensure sharper surfaces and tighter edges while localizing metal dust collection.

04

Tool & Protocol Optimization

Strict tool-selection matrices and handling rules designed to eliminate human error, reduce metal loss, and cut processing times.

Double-station Polishing Machine
Polishing Bench (Front View)
THE VISION

Long-Term Operational Independence

Skin in the Game

We supply the technical expertise, operational systems, and high-efficiency machinery; you bring the market strength.

Upskilling Local Workforce

We train and certify your Balinese workforce in world-class, export-grade manufacturing standards, elevating local capabilities.

The Ultimate Outcome

Faster turnaround times, absolute production quality control, and zero reliance on unpredictable, third-party foreign suppliers.

GETTING STARTED

Let's Build the Floor

A simple, structured plan to transition Karma Jewelry's manufacturing operations.

01

Audit Bottlenecks

Audit Karma Jewelry's current production, metal wastage rate, and Bali floor bottlenecks.

02

Select Integration Model

Determine the preferred partnership model (Team Member or Team Member + Machinery).

03

60-Day Implementation

LAUNCH

Deploy core team members, calibrate machinery, and transition production floor operations.